Project Highlights:

  • Due Diligence
  • Water Balance
  • Climatology
  • As-Built Drawing & Report
  • PMF Hydrology & Hydraulic Designs
  • Conventional TSF Remediation Design
  • Dam Monitoring
  • Foundation Designs
  • Detailed Design for Construction
  • Operations Plans
  • CQA

Contonga, a 990 tpd underground Zinc mine located in Perú’s Ancash Region, has been in operation for more than 25 years. Tierra Group team members assisted Nyrstar’s acquisition due diligence team by performing a fatal flaw analysis of Contonga’s Tucush Tailings Storage Facility (TSF) in 2009. Following the acquisition, Tierra Group’s team developed a modification plan to the 40-m high cyclone tailings dam to meet regulatory requirements and to allow the mine to continue operating. Two subsequent dam raise designs have been developed, which will allow Contoga Mine to continue operating through 2015, at which time a new TSF will be required. In anticipation of Tucush’s closure, Tierra Group has initiated a siting study to identify a new TSF location, and conceptual closure and reclamation planning has begun. Tierra Group’s current contracted work includes expansion design for the Tucush TSF, providing operations support, and designing a foundation for a new crusher.

Project Highlights:

  • Due Diligence
  • Water Balance
  • Climatology
  • As-Built Drawing & Report
  • PMF Hydrology & Hydraulic Designs
  • Conventional TSF Remediation Design
  • Dam Monitoring
  • Foundation Designs
  • Detailed Design for Construction
  • Operations Plans
  • CQA

Similar projects

La India Mine

GoldSim Training Tierra Group provided GoldSim training to the Agnico Team and updated the heap leach water balance. Phase 2 & 3 Heap Leach Pad Design and Construction Quality Assurance Tierra Group provided engineering design services for the Phase 2 and 3…

VIEW PROJECT

El Aguila

Dry Stack Tailings Options Analysis Tierra Group performed an independent TSF expansion engineering design peer review. The review resulted in cost savings ($650,000) without compromising the facility's design integrity over the original design. Tierra Group also provided full-time CQA. Tierra…

VIEW PROJECT

Anglo American Quellaveco Mine | PerĂº

Tierra Group supervised a geotechnical and hydrogeologic drilling investigation program at Anglo American’s Quellaveco Mine in the Moquegua Region of Peru. Geotechnical Investigation Tierra Group developed a geotechnical and hydrogeological research plan within and near the Quellaveco Pit footprint. This…

VIEW PROJECT

Santa Pancha Mine

Tierra Group provided a desktop and field review of B2Gold’s Santa Pancha Mine hydrogeology. The review identified data gaps in site data and provided recommendations for improve an existing site hydrogeology model and improve underground water management. The hydrogeologic model…

VIEW PROJECT

Marlin Mine

Tierra Group provides Tailings Stewardship Services for the Marlin Mine Tailings Storage Facility. Tierra Group performed a 5-year Dam Safety Review consistent with the Canadian Dam Association protocols, a Facilitated Risk Assessment, site training and in depth inspections of management…

VIEW PROJECT

Los Gatos Project

TSF Design and CQA Tierra Group provided detailed Stage 1 and 2 Tailings Storage Facility design, conducted a process plant geotechnical foundation investigation, and provided Construction Quality Assurance for Sunshine Silver Mining's Los Gatos Project in Chihuahua, Mexico. Tierra Group then…

VIEW PROJECT

El Mochito Mine

El Mochito is an underground zinc/silver mine located in the Santa Barbara Mountains in north-central Honduras. Tierra Group’s Team has been providing Tailings Stewardship Services at El Mochito continuously for the past 26 years. Since 1989, Tierra Group engineers have provided…

VIEW PROJECT

Pit Slope Design | County Line Project

Tierra Group conducted a geotechnical investigation program to provide data for pit slope design. Tierra Group provided field support through oriented core logging, pit wall mapping, selected samples for laboratory testing, and provided pit slope design recommendations for safe open…

VIEW PROJECT

Pierina Mine

Barrick Gold Corporation’s Pierina Mine in Ancash Department, Perú began operations in 1998. A progressive reclamation and closure plan began in 2013.  In 2015-16 Tierra Group developed detailed engineering designs for channels, sediment traps, two 45,000 m3 sediment ponds, water…

VIEW PROJECT

Black Butte Copper Project

Tierra Group performed an independent engineering design review of a Cemented Tailings Facility (CTF) and multiple processes and freshwater ponds. Tailings will be mixed with cement at the paste plant and deposited in the CTF along with underground mine development…

VIEW PROJECT

Empire State Mine

Dam Breach Analyses Tierra Group prepared a DBA to evaluate potential downstream impacts due to a hypothetical failure (breach) in three components of Empire State Mines (ESM) tailings storage facility (TSF): North Dam (ND), South Dam (SD), and West Perimeter…

VIEW PROJECT

Lagunas Norte Mine

The Lagunas Norte Mine, operated by Barrick Misquichilca S.A., is an open pit gold mine located in the Quiruvilca district, Santiago de Chuco province, La Libertad department, Perú. The main study objective was to evaluate the volume of effluent discharge…

VIEW PROJECT