Tailings Assurance Audit | Canada

Project Highlights:

  • Tailings Assurance Audit

Tierra Group completed a Tailings Assurance Audit (TAA) for a closed Tailings Storage Facility (TSF). The TAA was completed to ensure the TSF and site operations complied with the Company's Tailings Management Standard, which closely mirrors Global Industry Standard on Tailings Management (GISTM) requirements. The TAA included a site visit, document review, and interviews with site personnel to determine compliance.

Project Highlights:

  • Tailings Assurance Audit

Similar projects

Guanacevi

Tierra Group provided Tailings Stewardship Services, including a dam inspection, slope stability review and operational improvements. The Guanacevi tailings storage facility, located in Durango, Mexico, consists of dry-stack (Press filtered) tailings placed atop a conventional (slurry) tailings storage facility.

VIEW PROJECT

Anaconda Mine

Tailings Storage Trade-Off Study Tierra Group completed trade-off studies evaluating potential TSF sites to store 25 million tonnes of tailings. Trade-off studies included dam layouts, cost estimating, and recommendations for future work. Trade-off study challenges were minimizing costs while still…

VIEW PROJECT

Fire Creek Mine

The Fire Creek Mine, located in north-central Nevada, is owned and operated by Klondex Gold & Silver Mining Company.  The mine is an underground mine that is operating a bulk sampling program and has recently submitted its Preliminary Feasibility Study. As…

VIEW PROJECT

El Mochito Mine

El Mochito is an underground zinc/silver mine located in the Santa Barbara Mountains in north-central Honduras. Tierra Group’s Team has been providing Tailings Stewardship Services at El Mochito continuously for the past 26 years. Since 1989, Tierra Group engineers have provided…

VIEW PROJECT

Brushy Creek

Tierra Group provided a raise design for Doe Run's Brushy Creek tailings embankment, a facility first commissioned in 1973. Cone penetration testing, liquefaction analysis, seepage modeling, and slope stability modeling were performed for the embankment. Hydrology, spillway design, and impoundment layout…

VIEW PROJECT

Amulsar Gold Project

Tierra Group completed a technical review of the heap leach pad for the Amulsar Mine property owned by Lydian Armenia located near the town of Jermuk to the southeast of Armenia. The heap leach pad consists of four phases with…

VIEW PROJECT

NioCorp’s Elk Creek | Tailings Storage Facility (TSF) Feasibility Study

Tierra Group advanced the TSF design to a Feasibility Level according to the Canadian National Instrument NI 43-101 and the U.S. Security and Exchange Commission’s Subpart SK-1300 regulation. Tierra Group’s scope of work included a geotechnical investigation, engineering analysis, and TSF…

VIEW PROJECT

Masbate Mine

Tierra Group performed a study of Masbate’s 12-Mt tailings storage facility. Services provided included a forensic study to determine the cause of seepage through an abutment and performed an independent safety audit of tailings management practices. A risk analysis was performed…

VIEW PROJECT

Tonopah Flats | Tailings Storage Facility

Tierra Group assisted with developing tailings disposal alternatives.

VIEW PROJECT

Çöpler Tailings Storage Facility and Heap Leach Facility Technical Review

Tierra Group has a history of annually providing third-party technical reviews for the tailings storage facility and heap leach facility at Anagold's Çöpler Gold Mine in Middle Anatolia, Turkey. Additionally, Tierra Group currently performs independent technical reviews for the rockfill…

VIEW PROJECT

Newcrest Cadia Tailings Stewardship

Tierra Group provided Tailings Stewardship Services for TSFs and water dams at the Cadia, Terfer, and Red Chris properties. Responsibilities included data/report review; identifying and assisting the client with managing risks, liabilities, controls, and reporting; evaluating progress towards GISTM compliance;…

VIEW PROJECT

Newcrest Telfer Tailings Stewardship

Tierra Group provided Tailings Stewardship Services for TSFs and water dams at the Cadia, Terfer, and Red Chris properties. Responsibilities included data/report review; identifying and assisting the client with managing risks, liabilities, controls, and reporting; evaluating progress towards GISTM compliance;…

VIEW PROJECT