Tierra Group provided Issued for Construction (IFC) design drawings and specifications for procurement requirements for the expansion of the Camino Rojo HLF.
Information required included liner specifications, drainage collection piping, and quantities. Additionally, Tierra Group will provide construction quality assurance (CQA) for the 22.7-hectare pad expansion.
Tierra Group provided Issued for Construction (IFC) design drawings and specifications for procurement requirements for the expansion of the Camino Rojo HLF. Information required included liner specifications, drainage collection piping, and quantities. Additionally, Tierra Group will provide construction quality assurance (CQA) for the 22.7-hectare pad expansion.