Statement of Qualifications

Mankind lives on the earth. Everything built, either originated from, is built on, or interacts with, the earth. Geology is the science of the earth. Geotechnical Engineering is the application of geology and mathematics to use Earth’s natural resources to build infrastructure. Tierra Group International, Ltd. applies its geotechnical expertise to the conception, design, construction, and operations of physical structures for the mining industry, including:

  • Foundations
  • Tailings Dams
  • Water Dams
  • Heap Leach Pads
  • Mine Pits
  • Waste Rock Dumps
  • Hydraulic Structures (Canals, Channels, Pipelines, etc.)
  • Civil Infrastructure (Plants, Buildings, Roads, Bridges, etc.)

Tierra Group has applied its 100+ years combined professional geological and engineering expertise consulting on, or designing and constructing, dozens of these structures on six continents. This geographic variety has allowed Tierra Group’s Team to develop expertise designing facilities under challenging geotechnical conditions such as:

  • Laterites
  • Saprolites
  • Swelling or Collapsible Soils
  • Karst
  • Variable Geology
  • Highly and Active Seismicity (Earthquakes)
  • High Altitudes (4,000-m amsl)
  • Tropics

Tierra Group has innovatively adapted to these challenging environments using highly-trained professionals and state-of-the-art techniques and software to perform the following tasks and analyses:

  • Site Characterization
  • Soil/Rock Mechanics
  • Geologic Hazards - Landslide, Rock Fall, Avalanches, Seismic (Earthquakes)
  • Geotechnical Analyses - Slope, Stability, Seepage, Settlement, Consolidation, Deformation, Liquefaction
  • Civil Design and Specifications
  • Construction Documents
  • Resident Engineering
  • Quality Assurance
  • Operations Support
  • Forensics and Mitigation
  • Peer Reviews

Regardless of the geotechnical challenges posed, Tierra Group’s broad experience, intimate attention to site-specific conditions, and keen focus on developing innovative solutions, has earned us a respected reputation and loyal clients around the world.


Select Geotechnical Projects

Esmeralda Mill

Tierra Group was contracted by Waterton Global Mining Company to prepare the FPCP for TSF No.1 at the Esmeralda Mine. TSF No.1 covered approximately 100 acres, included a rockfill embankment with a maximum height approximately 60 feet, and stored gold tailings. Work…

VIEW PROJECT

Stillwater Mine

Nye-Hertzler Tailings Independent Review Panel (2020-2023) Tierra Group reviewed the TSF design to support an NI 43-101 compliant Feasibility Study. The TSF design incorporated a paste tailings disposal method in an environmentally sensitive fisheries habitat. Tierra Group sits on the Independent Review…

VIEW PROJECT

Antapaccay

Glencore’s Antapaccay mine is located in the Espinar province, Cuzco, Perú. Tierra Group logged geotechnical, geological and geo-mechanical properties of drill core advanced in Antapaccay's Northern Pit. Approximately 6,000 meters of core were logged. Specific samples were selected for geotechnical…

VIEW PROJECT

Yauricocha Mine

The Yauricocha Mine is a polymetallic (copper, lead, zinc) underground mine located in Yauyos Province, Lima, Peru. Tailings are deposited in the Yauricocha Tailings Storage Facility (TSF) located 3km from the process plant. Tierra Group was engaged in 2015 to…

VIEW PROJECT

Rosario Mine

Tierra Group performed a Dam Safety Review (DSR) including geotechnical investigations and seepage and slope stability analyses for a 20-m high TSF at this 300‑tpd underground polymetallic mine. The audit was prepared following the Mt. Polley tailings dam failure in…

VIEW PROJECT

Goldstrike Mine

Engineer of Record Barrick’s Goldstrike Mine processes 30,000 tons of gold ore per day from its combined open-pit/underground operations located in the historic Carlin Trend in Nevada, U.S.A. Goldstrike’s tailings are stored in the North Block Tailings Disposal Facility (NBTDF).…

VIEW PROJECT

North Mara Mine | Tailings Assurance Audit

Tierra Group completed a TAA for the North Mara Tailings Storage Facility (TSF). The TAA was completed to ensure the TSF and site operations complied with Barrick’s Tailings Management Standard, which closely mirrors the Global Industry Standard on Tailings Management (GISTM)…

VIEW PROJECT

Hollister Waste Rock Facility

Hollister Waste Rock Facility Storage Tierra Group performed a third-party peer review of a Waste Rock Storage Facility (WRSF) design at Klondex Mines’ (Klondex) Hollister Mine in northern Nevada. The WRSF, as designed, involved lining the mine’s existing West Pit…

VIEW PROJECT

Ernesto e Pau-a-Pique

The Ernesto e Pau-a-Pique (EPP) Mine is located in the Municipality of Pontes e Lacerda, at 440 kms west of Cuiba City, Brazil. The mine is operated by Apoena Mining, a subsidiary of Aura Minerals Inc. Tierra Group was retained…

VIEW PROJECT

San Bartolome Mine | NI 43-101 Tailings Technical Review & Report

Tierra Group performed an Independent Tailings Technical Review to support the San Bartolomé Mine Prefeasibility Study (PFS) NI 43-101 Technical Report (TR). SRK Consulting Inc. (SRK) is the primary TR author. Tierra Group will provided a Qualified Person (QP) to oversee…

VIEW PROJECT

Morelos Mine

Tierra Group designed and implemented a stability and safety monitoring plan for Torex Gold’s Morelos Mine dry stack tailings storage facility (TSF). The monitoring plan includes installing inclinometers and vibrating wire piezometers, and training operations staff to download instrumentation readings.…

VIEW PROJECT

Brushy Creek

Tierra Group provided a raise design for Doe Run's Brushy Creek tailings embankment, a facility first commissioned in 1973. Cone penetration testing, liquefaction analysis, seepage modeling, and slope stability modeling were performed for the embankment. Hydrology, spillway design, and impoundment layout…

VIEW PROJECT